Our Projects


Clients:

Projects

Description

Year

Aproximated Value

Pharmaceuticals Plants

Lilly Del Caribe, Carolina

Pilot Plant

Performed a complete QA/QC of the piping fabrication and installation. We checked welder certifications, welding procedures and materials to assure they are as specified. We received materials and verified their specifications. At the field we inspected piping welds visually and with boroscope. We verified slopes and certified high purity piping passivation process. We prepared the final Turn over package utilized in the validation process.

2012


Pfizer, Guayama

Purified Water Storage Tanks Replacement Project

Performed a complete QA/QC of the piping fabrication and installation. We checked welder certifications, welding procedures and materials to assure they are as specified. We received materials and verified their specifications. At the field we inspected piping welds visually and with boroscope. We verified slopes and certified high purity piping passivation process. We prepared the final Turn over package utilized in the validation process.

2012


Cytec Carbon Fibers LLC, South Carolina

Inspection of Stainless Steel and Carbon Steel Pipe

Performed a complete QA/QC of the piping fabrication and installation. We checked welder certifications, welding procedures and materials to assure they are as specified. We received materials and verified their specifications. At the field we inspected piping welds visually and with boroscope. We verified slopes and certified high purity piping passivation process. We prepared the final Turn over package utilized in the validation process.

2013


Aireko

Lyo Bio Patch Facilities Bldg.2

Performed a complete QA/QC of the piping fabrication and installation. We checked welder certifications, welding procedures and materials to assure they are as specified. We received materials and verified their specifications. At the field we inspected piping welds visually and with boroscope. We verified slopes and certified high purity piping passivation process. We prepared the final Turn over package utilized in the validation process.

2013


Abbott, Anasco

Acrylic Expansion

Performed a complete QA/QC of the piping fabrication and installation. We checked welder certifications, welding procedures and materials to assure they are as specified. We received materials and verified their specifications. At the field we inspected piping welds visually and with boroscope. We verified slopes and certified high purity piping passivation process. We prepared the final Turn over package utilized in the validation process.

2013


Abbvie, Barceloneta

Water System extension

Performed a complete QA/QC of the piping fabrication and installation. We checked welder certifications, welding procedures and materials to assure they are as specified. We received materials and verified their specifications. At the field we inspected piping welds visually and with boroscope. We verified slopes and certified high purity piping passivation process. We prepared the final Turn over package utilized in the validation process.

2014


Lilly Del Caribe, Caroina

Fermentation Building SKPB Project

Performed a complete QA/QC of the piping fabrication and installation. We checked welder certifications, welding procedures and materials to assure they are as specified. We received materials and verified their specifications. At the field we inspected piping welds visually and with boroscope. We verified slopes and certified high purity piping passivation process. We prepared the final Turn over package utilized in the validation process.

2014


Suiza Dairy

Amonia Project

Performed a complete QA/QC of the piping fabrication and installation. We checked welder certifications, welding procedures and materials to assure they are as specified. We received materials and verified their specifications. At the field we inspected piping welds visually and with boroscope. We verified slopes and certified high purity piping passivation process. We prepared the final Turn over package utilized in the validation process.

2014


Clients:

Projects

Description

Year

Aproximated Value

Pharmaceuticals Plants

Abbott, Añasco

Welding Inspection

Performed a complete QA/QC of the piping fabrication and installation. We checked welder certifications, welding procedures and materials to assure they are as specified. We received materials and verified their specifications. At the field we inspected piping welds visually and with boroscope. We verified slopes and certified high purity piping passivation process. We prepared the final Turn over package utilized in the validation process.

2014


Abbvie, Baceloneta

Millenuim Project

Performed a complete QA/QC of the piping fabrication and installation. We checked welder certifications, welding procedures and materials to assure they are as specified. We received materials and verified their specifications. At the field we inspected piping welds visually and with boroscope. We verified slopes and certified high purity piping passivation process. We prepared the final Turn over package utilized in the validation process.

2014


Elanco, Augusta Georgia

API Expansion Project

Performed a complete QA/QC of the piping fabrication and installation. We checked welder certifications, welding procedures and materials to assure they are as specified. We received materials and verified their specifications. At the field we inspected piping welds visually and with boroscope. We verified slopes and certified high purity piping passivation process. We prepared the final Turn over package utilized in the validation process.

2015


Lilly Del Caribe, Carolina

Urea Project

Performed a complete QA/QC of the piping fabrication and installation. We checked welder certifications, welding procedures and materials to assure they are as specified. We received materials and verified their specifications. At the field we inspected piping welds visually and with boroscope. We verified slopes and certified high purity piping passivation process. We prepared the final Turn over package utilized in the validation process.

2015


Lilly Del Caribe, Carolina

ACN Project

Performed a complete QA/QC of the piping fabrication and installation. We checked welder certifications, welding procedures and materials to assure they are as specified. We received materials and verified their specifications. At the field we inspected piping welds visually and with boroscope. We verified slopes and certified high purity piping passivation process. We prepared the final Turn over package utilized in the validation process.

2015

$100K+

Amgen, Juncos

Utilities Project Consolidation

Performed a complete QA/QC of the piping fabrication and installation. We checked welder certifications, welding procedures and materials to assure they are as specified. We received materials and verified their specifications. At the field we inspected piping welds visually and with boroscope. We verified slopes and certified high purity piping passivation process. We prepared the final Turn over package utilized in the validation process.

2015


Amgen, Juncos

AML 6 Tech Transfer Project

Performed a complete QA/QC of the piping fabrication and installation. We checked welder certifications, welding procedures and materials to assure they are as specified. We received materials and verified their specifications. At the field we inspected piping welds visually and with boroscope. We verified slopes and certified high purity piping passivation process. We prepared the final Turn over package utilized in the validation process.

2015


Bristol Myers Squid

Vernon Product Transfer Project

Performed a complete QA/QC of the piping fabrication and installation. We checked welder certifications, welding procedures and materials to assure they are as specified. We received materials and verified their specifications. At the field we inspected piping welds visually and with boroscope. We verified slopes and certified high purity piping passivation process. We prepared the final Turn over package utilized in the validation process.

2015



Featured Posts
Check back soon
Once posts are published, you’ll see them here.
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Social Icon
bottom of page